The entry point

One day. One document. No obligation.

Most hotels are one retirement away from not knowing where the main shut-off is. The technical dossier fixes that in a working day — and tells you, precisely, where your building stands.

1d
Browse a sample · Object 03, abridged
01 · System inventory · Object 03 · 74 roomsSurveyed 2026-03-11
SystemMake / yearConditionContractSpares
Heating — gas condensingHoval / 2014B · serviceable✓ mfr.low
Heat pump, DHWCTA / 2021A✓ mfr.low
Ventilation, kitchenBelimed / 2009C · ageingnonemedium
Lift, 8 pers.Schindler / 2016B✓ mfr.low
Fire alarm panelSiemens / 2018A✓ TSPMlow
Main distribution boardunknown / ~1998D · replacenonehigh
WLAN, 41 APsUbiquiti / 2019B✓ ICT partnerlow
Sheet 2 / 31 · items 7 of 46 shown
02 · Compliance calendar · Status at 2026-08-14Object 03
InspectionIntervalLastDueEvidence
Integral test, fire systems4 years03.202303.2027✓ protocol
Emergency lighting2 × yearly02.202608.2026✓ protocol
Fire alarm panelyearly11.202511.2026✓ protocol
Electrical installation (NIV)5 yearsoverdue 14 mo.none
Evacuation drillyearly09.202409.2026✓ report
Kitchen extractionyearly06.202606.2027✓ protocol
Legionella samplingyearly05.202605.2027✓ lab report
Sheet 9 / 311 gap · flagged red
03 · Defect register · Ranked by risk × cost12 open · 4 shown
#FindingRiskEst. costRecommendation
D-01NIV control overdue; board ~1998highCHF 3–5kthis quarter
D-02Kitchen ventilation end-of-lifemediumCHF 38kbudget 2027
D-03Corridor doors 2F: closers wornmediumCHF 2.1kthis year
D-04Roof drainage, west valleylowCHF 800with next visit
Sheet 17 / 31«Never» category: 3 items
04 · Twelve-month plan · Sequenced by risk, then seasonObject 03
WhenActionWhoEst.
Sep 2026NIV control + board quoteTSPM + control bodyCHF 1.2k
Sep 2026Evacuation drill (due)TSPMin mandate
Oct 2026DHW pump spare orderedTSPMCHF 1.8k
Nov 2026Door closers 2FTSPM carpentryCHF 2.1k
Jan 2027Kitchen vent: tender for 2027 budgetTSPM + partner
Mar 2027Integral test preparationTSPMin mandate
Sheet 28 / 31 · total year-one: CHF 7.1k + budgeted capex
pump spare for DHW — 8 wks delivery. order before winter?
— P.M.

Illustrative sample. Real dossiers run 25–40 sheets and are considerably less tidy on day one — that is rather the point.

Day one — and month six

The folder above is what you buy. This is what it becomes.

01–07System inventory · 46 systemscurrent
08–12Compliance calendar1 gap
13–19Defect register · 12 open, 31 closed2 active
27–31Twelve-month planon track

Every time we work in your building, the document updates itself. Thirty years of institutional memory, no longer stored in one person's head — and yours to keep in Kontrollheft either way. See the dossier come alive in the portal →

7.1 · How the day runs

Morning — the building

Basement to roof with whoever knows the house best. Every system photographed, labelled, condition-rated. We have never once finished a morning without at least one “so that's what that does”.

Afternoon — the paper

Contracts, protocols, permits, the folder from the predecessor's predecessor. We reconcile what was done against what was due. This is where the surprises live.

Ten working days later

The dossier arrives: inventory, compliance calendar with evidence status, defects ranked by risk and cost, a twelve-month plan. Presented in person, in about an hour.

Fixed price
CHF 2,400

Houses up to ~100 rooms. Larger and multi-building properties quoted before we start — also fixed. No follow-on obligation of any kind.

Call to book — 052 229 85 82

Or write: peter.machac@tspmgmbh.ch. Surveys scheduled within two weeks.

Either way · the outcome

If we find nothing wrong, you have proof. If we find something, you have a plan.

Either way, the next conversation about your building starts from facts — which, in our experience, is where most hotels have never started it before. And every dossier is delivered into Kontrollheft, the free building file — yours to keep, even if we never meet again.